"The PowerKure technology has reduced our overall hydro consumption by an impressive 6.1% annually. Even with our long history of energy conservation initiatives, Bill Jackson of PowerCon and the PowerKure team, found savings that created a project with a 2.4 year payback. PowerKure technology provides real sustainable savings at a cost that makes sense.”
Tim Connelly, Manager of Plant Operations, Baycrest Centre, Toronto
"We want to thank Powercon for the efficient way the PowerKure System was installed and also for not having any unscheduled shutdowns. It looks like we will probably save more than what was predicted in the original proposal giving us a better payback"
Rebecca Spagnolo, Assistant Dean, Graduate House, School of Graduate Studies, University of Toronto
“After performing due diligence, in December 2002 we installed the PowerKure System in two of our buildings, which are mainly residence and offices. The performance of the PowerKure System was then verified justifying an installation in another classroom and office building on our Campus which was completed June 2005. We appreciate having the system at Trinity and will reap the benefits of savings in electricity costs and improved power quality far into the future.”
Joe Dunham, Manager Building Services, University of Toronto, Trinity College
"Since the installation of PowerKure, we have realized electric bill reductions of $36,000. Furthermore, unlike in the past, we have not experienced any power sags, surges or brownouts. PowerKure has performed as specified and will be a profitable energy saving addition to any facility."
Richard McCollin, Plant Engineering, Ford Canada Inc. Visteon Plant
"I appreciate the service and efficient follow up that you and your staff provided to us on the project. Famous Players Inc. is pleased with the equipment, results, and service. It is our intention to install your equipment in our recently completed theatres throughout the country and to include your equipment into Famous Players Inc. standards for new construction."
Robert G. DeWolfe. CET, MMCHE, CD National Facilities Manager, Famous Players Inc.
"The predicted savings of the PowerKure system before implementation was approximately $6,600. With the actual savings of $16,500, one can see that the system exceeded expectations by 2.5 times. With these savings, and the cost of the system at just over $27,000, the resulting payback period is approximately 1.65 years.
Mike Schmidtler, P.Eng, General Manager, Pipe and Standard Products,
Lafarge Construction Materials
"Other than the reduction in energy bills, the maintenance of the motors and other electrical equipment at our facility has been significantly reduced."
Xavier Joseph, President, Narroflex
"We saved the capital cost of increasing the size of our transformer, and showed significant savings in power usage. I would recommend your services to any significant user of electricity.
Andrew M. MacDonald, Vice President and General Manager, Torcad Limited
Based on the tests carried out on-site, and both the calculations from PowerKureTM and our independent calculations, it appears that the savings to be realized will actually be higher than those utilized in the projected payback analysis; thereby yielding a faster payback than anticipated.
H.H. Angus & Associates Limited, Consulting Engineers for Husky Injection Molding
|
| |
|